Golf & Sports Turf
For golf courses, superintendents & sports turf managers
Water restrictions, dry spots, lost greens, and rising input costs are putting golf courses under unprecedented pressure. President Water Vortex Generators resolve all of these โ inline, passively, and permanently.

Key Benefits
Operate under restrictions
Confidently meet water license targets without compromising playability or presentation.
Eliminate dry spots & lost greens
Vortex-structured water penetrates hydrophobic soils uniformly โ documented zero lost greens at Marri Park after 5 consecutive seasons of losses.
Reduce fertilizer up to 60%
Improved nutrient bioavailability means less product needed for the same or better turf density and color.
Cut hand-watering time
Healthier, more resilient turf means less early-morning troubleshooting and intervention time for your team.
Extend infrastructure life
Reduced scale and biofilm formation extends pump life and reduces friction loss across the system.
Defensible, documented savings
SmartDrop and Waterwise certifications provide independently verified, metered water savings your board and members can see.
See what the numbers look like.
Based on typical results. Your actual savings may vary.
| Item | Before | After | Savings |
|---|---|---|---|
| Irrigation demand (Marri Park, Feb) | 100% | 70.1% | 29.9% |
| Season-to-date reduction | 100% | 80.9% | 19.1% |
| Greens lost | Each of prior 5 yrs | Zero | Zero loss |
| Marri Park โ metered year-over-year | 46.56M L saved season-to-date | ||
Case Studies

The Western Australian Golf Club ยท Irrigation Upgrade
An 8 inch and a 10 inch unit went in during May 2026 as part of a multi-million dollar irrigation upgrade, driven by a 10% cut to the club's water license from 2028. Water, pump efficiency, labor, hardware and fertilizer are all being monitored.

Marri Park Golf Course
Twelve months of bore (well) meter data on a Bassendean sand course. Usage fell 30.1% against a three-year average, and the course carried out no returfing for the first time in four years.

Curtin University โ Midland Campus
Waterwise university held to 2-day-per-week watering. Healthier turf through a 38ยฐC summer with no extra irrigation โ they bought more units.
Technical Specifications
- Inline installation โ fits existing mains, no infrastructure change
- No electricity, no moving parts, no consumables
- 316L marine-grade stainless steel construction
- 10-year performance warranty on all commercial units
- Compatible with bore (well), scheme, dam, reclaimed and mains water
Implementation Process
- 01
Site Assessment
We review your water source, infrastructure, soil conditions, and the outcomes you need.
- 02
Specification
We match the right line size and model (ยพ" to 12") to your flow rate and system.
- 03
Inline Installation
Units install inline on your existing mainline โ typically completed in one visit.
- 04
Measure & Verify
We help set up metered before/after measurement so the savings are documented, not estimated.
Ready to see results?
Get a free site assessment and learn how structured water can deliver ROI for your operation.
